Skip to main content
GPT Group logistics warehouse and hardstand at the Kemps Creek precinct

Projects / Industrial

Yiribana West Logistics Estate — The GPT Group

Lotos Concretors delivers super flat fibre reinforced warehouse floors and external hardstands for The GPT Group at Yiribana West Logistics Estate, Kemps Creek — Sydney's Mamre Road industrial precinct.

LocationKemps Creek, NSW ClientThe GPT Group StatusStage 1 underway

20,000 sqm

Super flat warehouse floors (Stage 1)

18,000 sqm

External hardstands (Stage 1)

Up to 36.8 ha across 3 warehouses

Yiribana West site area

A flagship logistics estate in Sydney’s fastest-growing industrial corridor

Yiribana West forms part of The GPT Group’s Yiribana Logistics Estate, a 230,000 sqm prime logistics precinct on the western edge of Sydney’s Mamre Road industrial corridor. With the Western Sydney Aerotropolis and the new Western Sydney International Airport ten kilometres away, and direct access to the M4 and M7, Kemps Creek has become the most strategically located industrial address in New South Wales.

Lotos Concretors is delivering the structural concrete works for Stage 1 of the GPT-owned western portion of the estate.

What Lotos is delivering

Stage 1 covers 20,000 square metres of fibre reinforced super flat warehouse floors and 18,000 square metres of heavy-duty external hardstand pavements. The internal floors are designed to support narrow-aisle operations and the high point-loads associated with modern automated and semi-automated logistics — the kind of work where flatness tolerances and slab durability are graded, not estimated.

The external hardstands are sized for full B-double turning, drive-around truck circulation and the wide loading aprons specified for tier-1 logistics tenants.

Further warehouses are already underway across the Yiribana West site, with Lotos contracted to deliver subsequent stages.

Sustainability and the Green Star target

The GPT Group has set a minimum 5-Star Green Star target for the estate, with on-lot stream health management — a first for the Mamre Road Precinct — alongside 100 kW of rooftop solar with battery storage, rainwater reuse and low-carbon concrete specifications across the warehouse program.

We work to those material specifications and coordinate closely with the project team on supply chain decisions that affect embodied carbon, including SCM blends and reinforcement detailing.

Watch this space for the next stages.

Talk to us about your next project

We deliver concrete construction across Greater Sydney for builders and developers who care about getting it right the first time.